Before the start of house construction (Footing, beams, columns, concrete floor)
35%
第2期
Before the start of roof and wall structure
30%
第3期
Before the start of work on roof tiles, water pipes, electric cables and plastering the wall
20%
第4期
Before the start of work on ceiling, tiling and painting
10%
第5期
After the completion of all painting, tiling and installation of taps, sinks, boilers, showers, toilet and windows. Last payment shall be made upon the Handover Date.